13 setting installation parameters – Eppendorf InjectMan 4 User Manual
Page 39
Installation
InjectMan
®
4
English (EN)
39
Prerequisites
• InjectMan 4 is switched off.
• The power cable is disconnected.
1. Connect the module (X,Y,Z) plug with the ports on the control board.
2. Tighten the fixing screws on the plug manually.
3. Connect the power cable.
4. Switch on the mains switch.
5. Set the installation parameters. You can use the software wizard
First set-up
or the
Installation
menu to set the
Side
and
Angle
parameters.
4.13
Setting installation parameters
Installation parameters must be set:
• for the first set-up
• after a reset
The following settings are defined:
• Installation side of the motor module
• Operating angle for the capillary
• Center motors
• Adjust motors
• Set date
NOTICE! Material damage from incorrect connections.
Only electrical connections may be made to devices described in the
operating manual.
Other connections are permitted only following consultation and agreement
with Eppendorf AG.
Only connect devices that meet the safety requirements defined in
IEC 60950-1.
NOTICE! Short circuit caused by incorrect installation.
Failure to observe the order of steps may result in a short circuit.