Warning, Powertrak, 10 connecting the powertrak and ev s – Hired-Hand Evolution Series 1200 User Manual
Page 48: Inset a, Inset b vent override, Inset c unit #2 tunnel pcb – 188 power ventilation, Evolution, Circuit board
Part No. 4801-5331 Rev 2-08
Evolution 1200
48 of 64
PowerTrak
AUX
SWITCH
CONTROLLER
AC IN
HOT
NEUT
.
LOW
E
R
GND
.
HOT
OU
T
C
L
OSE
IN
OPE
N
IN
CO
M
UP
P
E
R
8.10 Connecting the PowerTrak and EV S
3
to the Evolution 1200
NOTE: If curtain is setup to pull curtain up to open, then reverse wires connected to "OPEN" and "CLOSE"
terminals.
NOTE: Only 1 Power Trak can be connected to each Power Trak outlet. If Additional Power Traks are needed,
Then use of relay boxes is necessary to separate the load.
NOTE: All PowerTrak units will connect the same.
Inset A
WARNING!
• Keep High Voltage (Or AC) Separate
From Low Voltage Wires!
• Do not perform modifications or wiring
with voltage applied!
Inset B
Vent Override
PT Hot
Open
Close
PowerTrak
Con
Ho
PT
Ho
PT
Open
Vent Override
Com
!
Inset A
Inset C
Unit #2 Tunnel
PCB – 188 Power Ventilation
Inset C
Evolution
S
3
Circuit Board
Inset B
Vent Override
NOTE: If connecting the S
3
to a
relay box instead of PowerTrak,
Cut and discard the four
components shown.
Tunnel Override