beautypg.com

Gf100 series – Brooks Instrument GF126 User Manual

Page 39

background image

2-19

GF100 Series

Installation and Operation Manual
X-TMF-GF100-Series-MFC-eng
Part Number: 541B137AAG
March, 2013

Section 2 Installation

2. Select the single device that you want to perform the commissioning and
click on "Connect to Device". The Commissioning button becomes enabled.

3. Click on the "Commission" button to begin the process. Some
intermediate messages will appear on the bottom mesage bar. You will then
be presented the option to override the current inlet gas pressure. Selecting
"Yes" will keep the current inlet pressure. Selecting "No" will allow the user
to overrided the pressure. Selecting "Cancel" will end the commissioning
process.