6.5.4.3 Provisioning the Baseline
The baseline allows the admittance to be tracked based on an Initial Cell Admittance value. 
Once this value is established admittance change alarms can be generated based on the percent 
change from the initial value. The following sections describe two ways of establishing the 
baseline. 
 
6.5.4.4 Baselining using the Present Measurement
For new jars PBT recommends setting the baseline using the present admittance measurement 
as a reference. With this approach the Admittance Change field will report the difference 
between the present sensor reading and the reading when the jar was new. This is the simplest 
and most accurate way to set the baseline. This method also works with jars that are not new, 
however keep in mind that the reference was taken at an unknown point in the jar life span. 
 
6.5.4.5 Baselining using Manufacturer’s Specifications
The Base can also be set using the jar manufacturer’s specified Admittance (or conductance) as 
the basis for the measured admittance value. Sometimes the manufacturer specifies a DC 
resistance or a short circuit current which allows the admittance to be calculated. Contact PBT if 
you need help with this. With this approach the Admittance Change field will report the 
difference between the present sensor reading and the manufacturer’s specification. Keep in 
mind that the manufacturer’s specified Admittance (or Conductance) is based on measurements 
made with an instrument and is subject to all of the variation factors listed above. In addition 
most Manufactures specify a +/- 20 % tolerance on their specified value. 
 
6.5.4.6 Setting a Baseline
Pressing the “S” button next to the Initial Cell Admittance label in the Single Jar Display screen
causes the Jar Setup 
Display screen to 
appear as shown 
below. 
To set a baseline 
based on a 
specification, enter the 
baseline admittance 
reading into the Set 
Initial Cell 
Admittance field. 
Press either the Set 
This Jar Only button 
to set the baseline for 
this jar, or Set Entire 
String button to copy 
this baseline to the 
entire String. The 
value will appear in 
the Initial Cell 
Admittance field and 
the date and time will 
be recorded for 
reference. The Cell 
Admittance Change 
field in the Single Jar 
Display will be 
updated to show the 