beautypg.com

Extron Electronics TLP 710TV User Guide User Manual

Page 35

background image

5.

The project can be uploaded to one or more TouchLink panels. To add a panel:

a.

From the

Project

menu, select

Add > Panel

. The Panel Manager dialog box

opens:

Figure 32.

Add a TouchLink Panel (b)

b.

In the Panel Manager dialog box, click the

Add Panel

icon (see the

illustration to the right) to add a new panel to the left pane.

c.

Highlight the name of the panel in the left pane to display the
properties of that panel in the right pane.

d.

When a new panel is added, it is assigned the default IP address
(192.168.254.254). To change the IP address, highlight the address property in
the right pane and type in the correct IP address. Update any other properties, as
required.

e.

Repeat steps 5b - 5d to add further panels, if required.

f.

Close the Panel Manager dialog box.

6.

Upload a project to a TouchLink panel as follows:

a.

Highlight a panel in the Properties window on the left side of the GUI Configurator
screen

b.

From the

Project

menu, select

Upload to Selected Panels

. The Build

Manager dialog box opens, showing the build progress. After the build is
complete, this dialog box closes and the File Upload Manager screen opens. The
upload begins automatically.

c.

Select

Close this dialog when upload completes

check box in the

Automatic Settings section so that the File Upload Manager screen closes
automatically when the upload completes. This option can be set before or during
the upload.

If this project has been uploaded to the TouchLink panel before, the user can upload
only the changes that have been made to the previous version. The project can
be uploaded to certain touchpanels selected from the list found within the Devices
section of the File Upload Manager screen.

TLP 710MV and TLP 710TV • Configuration Software

29

This manual is related to the following products: