6920dw sonde bulkhead, Lubricate o-rings – YSI 600DW-B Sonde User Manual
Page 19
Sondes
Section
2
6920DW SONDE BULKHEAD
6572 Free chlorine probe = 3-pin connector
3
5
4
FREE
CHLORIN
E
EE
COND/TEMP
ISE1/ISE2
pH/ORP
ISE3
ISE4
ISE5
MOUNTING SCREW
1 OF 2
TURBIDITY
CHLOROPHYLL
RHODAMINE WT
6560 Conductivity/Temperature = 6-pin connector
6561 pH = 4-pin connector
6565 Combo pH/ORP = 4-pin connector
6566 Fouling Resistant pH//ORP = 4 pin connector
6561FG pH (Flat Glass) = 4-pin connector
6565FG pH/ORP (Flat Glass) = 4-pin connector
6882 Chloride Probe = leaf spring connector
6883 Ammonium Probe = leaf spring connector
6884 Nitrate Probe = leaf spring connector
6026 Turbidity Probe, Wiping = 8 pin connector
6136 Turbidity Probe, Wiping = 8 pin connector
6025 Chlorophyll Probe, Wiping = 8 pin connector
6130 Rhodamine WT Probe, Wiping = 8 pin connector
LUBRICATE O-RINGS
Apply a thin coat of O-ring lubricant, supplied in the YSI 6570 Maintenance Kit, to the O-rings on the
connector side of each probe that is to be installed.
LUBRICATE O-RINGS
CAUTION: Make sure that there are NO contaminants
between the O-ring and the probe. Contaminants that are present
under the O-ring may cause the O-ring to leak
when the sonde is deployed.
NOTE: Before installing any probe into the sonde bulkhead, be sure that the probe port is free of
moisture. If there is moisture present, you may use compressed air to blow out the remaining moisture.
INSTALLING THE TURBIDITY, CHLOROPHYLL, AND RHODAMINE WT PROBES
If you have a turbidity, chlorophyll, and/or rhodamine WT probe, it is recommended that the optical
sensors be installed first. If you are not installing one of these probes, do not remove the port plug, and go
on to the next probe installation.
YSI Incorporated
Drinking Water Monitoring Systems Operations Manual
2-12