beautypg.com

Assembly – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1579 User Manual

Page 59

background image

Assembly

47

PNEG-720-G2 12" & 16" Series II Sweep

17. CENTER PIVOT INSTALLATION (cont.)

9. Connect the 1" x 48" liquid-tight flex conduit to the pivot tube using one (1) 1" conduit coupling and

one (1) 1" liquid-tight flex conduit coupling.

10. Connect the 1" x 48" liquid-tight flex conduit to one of the junction boxes using one (1) 1" liquid-

tight flex conduit coupling. Connect the leads as required.

1" x 48" flex
conduit

1" flex conduit
coupling

1" conduit
coupling

pivot tube

The plugs are different for each cord and MUST be assembled correctly. This
is done so the cords can not be plugged into the control panel incorrectly.

11. The customer is to provide proper power cord protection between the pivot assembly and the

sump transition.

12. The multi-conductor power cord can be connected with the 14 AWG/3 wire, 14 AWG/4 wire, and

10 AWG/4 wire cords in an explosion proof junction box .

13. Use the plugs provided with the junction box to close the holes not being used.

14. Assemble the cord plugs to the other end of each of the cords. The 14 AWG/4 wire cord requires

the "HBL2431SW" plug. The 8AWG/4 & the 10 AWG/4 wire cord requires the "CS8165C" plug.
The 14 AWG/3 wire cord requires the "HBL2311SW" plug.

FIG. 17-A9