Assembly

37

PNEG-720-G2 12" & 16" Series II Sweep

See the chart for the correct size of conduit to the corresponding sweep size.

15. ELECTRICAL ASSEMBLY

Caution! All electrical wiring and service work must be performed by a qualified
electrician and must meet all State and Local electrical codes.

Sweep Section Conduit Sizes

Bin

10' Conduit

Other

Diameter

Pieces

Pieces

36'

N/A

1 @ 9'

37'

1

N/A

39'-40'

1

1 @ 1'

42'

1

1 @ 2'

43'-45'

1

1 @ 3'

48'-49'

1

1 @ 5'

51'

1

1 @ 6'

54'-55'

1

1 @ 8'

57'

1

1 @ 9'

59'

2

N/A

60'

2

1 @ 1'

62'-63'

2

1 @ 2'

66'

2

1 @ 4'

68'-69'

2

1 @ 5'

72'

2

1 @ 7'

75'

2

1 @ 8'

78'

3

N/A

80'-81'

3

1 @ 1'

84'

3

1 @ 3'

87'

3

1 @ 4'

88'

3

1 @ 5'

90'-91'

3

1 @ 6'

92'

3

1 @ 7'

95'

3

1 @ 8'

98'

4

N/A

105'

3

1 @ 9'

113'-120'

4

N/A

A. Place the 3/4" rigid conduit in order starting with the head section

and working towards the tail or extension section.

B. Connect the rigid conduit together using one (1) 3/4" conduit

coupling between each piece of conduit.

3/4" conduit
coupling

3/4" rigid
conduit

3/4" rigid
conduit

FIG. 15-B