beautypg.com

Installation, 1 unpacking and checking the standard equipment – Ohaus MB45 MOISTURE ANALYZER Manual User Manual

Page 12

background image

10

MB45

2. Installation

In this section, you will learn how you unpack and install your new Moisture Analyzer and prepare it for
operation. On completion of the steps described in this section, your Moisture Analyzer is ready for
operation.

2.1 Unpacking and checking the standard equipment

Open the package and remove the instrument and the accessories. Check the completeness of the
delivery.

The following accessories are part of the standard equipment of your new Moisture Analyzer.

— 1 Box, Aluminum sample pans
— 1 Pan support
— 1 Specimen sample (circular, absorbent cellulose disk)
— 1 Draft shield element
— 1 Heat shield
— 1 Power cable
— 1 Set of operating instructions
— 1 Warranty card

Remove packing material from the instrument.

Check the instrument for transport damage. Immediately inform your Ohaus dealer if you have
complaints or parts are missing.

Store all parts of the packaging. This packaging guarantees the best possible protection for the transport
of your instrument.