14 mounting, 1 check of the filter element – M&C TechGroup SP2400-H Operator's manual User Manual
Page 16
![background image](/manuals/255963/16/background.png)
16
Gas sampling and gas conditioning technology
2-1.1-ME
Before mounting, the probe must be adjusted to the existing operating conditions.
The existing operational parameters are to be checked accordingly prior to commencing
mounting work.
Low-excess pressure situation
mbar
bar
Process temperature
°C, Min.
°C Max.
Dust loading
g/m³
Dust composition – grain size
µm
Gas composition
corrosive toxic
explosive
Parameters to be measured, e.g. O
2
, CO, SO
2
,
NO
X
,..,
Vol.%
mg/Nm³ ppm
Necessary gas flow
l/hr, Min.
l/hr, Max.
Necessary T
90
-time
s
14 MOUNTING
M&C SP2000
probes are designed for stationary use and if properly selected and mounted a long
service life and minimum maintenance are guaranteed.
It is advisable to mount the probe in an operational position which is at a 10% inclination to the pro-
cess.
14.1
CHECK OF THE FILTER ELEMENT
Before starting the filter element has to be checked for tight fit.
Figure 3
Cross-sectional drawing SP2000-H
Removing the filter housing lid to check or change the filter element has to be done as follows :