Procedure 53
Calculating expected pulse loss

1

Collect loop makeup data between the line card and the terminal. For
each cable section, the data required is:

cable type (PIC or pulp)

gauge

length

type of plant construction (underground, aerial, or in-building)

2

Calculate individual cable section losses by using the figures in Table 42
on

page 305

through Table 44 on

page 306

, and the following equation:

CSLi = SLi x Li

CSLi = cable section loss for section i

SLi = section length of section i

Li = loss per unit length for section i

3

Correct individual cable section losses for maximum cable temperature
by using the following equation:

TCLi = CSLi x TCFi

TCLi = temperature corrected loss for section i

TCFi = temperature correction factor for section i

Correction factors:

aerial cable TCF = 1.1

underground cable TCF = 1.04

in-building cable TCF = 1

4

Determine junction loss (see Figure 49).

Note: Junction loss due to gauge discontinuity of outside plant cables
and D inside wire varies between 0.03 dB and 0.07 dB and can be
ignored. However, AMP 25-pair under-carpet wiring has a characteristic
impedance of 40 ohm at 256 kHz, and its junction loss is approximately
2 dB. This must be included in the calculation.

5

Calculate the expected pulse loss (EPL) by finding the sum of the items.