Network verification testing – Paradyne COMSPHERE 3611 User Manual
Page 15
COMSPHERE 3600 Series Data Service Units
2-6
September 1996
3610-A2-GB48-50
6. Press the
or
key to scroll the MUX option
set into view.
7. Press the function key directly below MUX. The
Change MUX Opts screen appears.
F1
Change MUX Opts:
Copy
Setup
Prt1
F2
F3
Prt2
Prt3
Prt4
Prt5
Prt6
8. Select a port:
•
Any of the installed ports, Prt1 through Prt6,
for a 6-port TDM/Flex or MCMP/Flex
•
Prt1 or Prt2 for a 2-port TDM/Flex or
MCMP/Flex
9. Press Next or Prev and select EIA-232 or V.35.
F1
DTE Port: EIA232
Next
EIA232 V.35
F2
F3
Prev
If you are . . .
Then return to . . .
Selecting another port
Change MUX Opts,
Step 7.
Finished
The Edit /Save screen.
10. Select SAVE.
Network Verification Testing
Perform verification testing after any installation.
.
Procedure
1. Request a device Identity report from each
tributary to ensure that the DSU is addressed
properly (ID from the Status branch).
NOTE
The Model 3610 is delivered
with its network address set to
254.
2. Perform a Digital Test on the DDS circuit to
ensure that the network is functioning (DT from
the Test branch).
Perform a Digital Test on each:
— Active port for TDM
— Tributary DSU for MCMP
NOTE
A
control DSU can originate a
Digital Test in a point-to-point or
multipoint network. Use Position
in the Diagnostic General
configuration option table to set
a unit to Cntrl.
A
tributary DSU can originate a
Digital Test in a point-to-point
network only, provided the
configuration option Respond to
Remote Digital Loopback
(RespondRDL) is enabled in the
control.
For additional verification steps, refer to Appendix D,