Installation checklist, Installation checklist -2 – Paradyne Jetstream CPX-1000 User Manual

Page 66

background image

3. Installing the CPX-1000

1000-A2-GN22-00

3-2

February 2003

Installation
Checklist

Photocopy or print these pages as quick reference to the steps
required for successful installation and turn up.

Task

Page Ref

Prepare for Installation (safety information, site preparation)

3-5

Unpack and inspect the CPX

3-10

Inventory CPX components

3-11

Attach mounting flanges

3-12

Mount CPX in rack
(optionally mount Splitter Assembly)

3-13
3-16

Connect plant battery and frame ground to CPX shelf

3-16

Install modules (cards) in CPX

3-19

Attach OC-3 ATM network cables

3-24

Verify hardware installation, (power, ground, and cards)

3-23

Attach Ethernet cables, MP to CP cards, and CPX to LAN

3-25

Attach CP redundancy cable

3-25

Connect CPX to Class 5 switch (Octal T1)

3-26

Connect CPX to Class 5 switch (12-port T1)

3-28

Attach STS-1 Cables

3-30