beautypg.com

Installation sequence server blades, Primergy bx600 s2 basic unit – FUJITSU PRIMERGY BX600 S2 User Manual

Page 74

background image

74

PRIMERGY BX600 S2 Basic Unit

Installation Sequence

Server Blades

©

c

o

g

n

it

as

.

Ge

s

e

lls

c

h

ft

f

ü

r T

e

c

h

n

ik

-Do

k

u

m

e

nt

at

io

n

m

b

H

2

007

P

fad:

H:

\w

in

dows

\_p

roj

e

k

te\

B

x

z

\B

e

tr

ie

b

s

a

n

le

it

un

g\

V

e

rs

ion_

M

a

e

rz

-2

007

\A

rc

h

iv

\B

X

6

0

0

S

2

_

en\

bl

ad

e-u

s

.k

0

7

The order in which the server blade slots are filled depends on whether you are
using 2-way server blades or 4-way server blades or a mix of the two, and how
the server blades are equipped.

Configuration Diagram for 2-way Server Blades

Slot 4 is filled first.

Next, slots 5 through 10 are filled in numerical order, followed by slots 1
through 3.

2-way server blades with SCSI controller in a PCI extension module can only
be installed in slots 5 and 6 because of the cabling arrangement in the rack
(see

section “Cable Routing” on page 43

).

Figure 31: Installation sequence for 2-way server blades

8

9

10

1

2

3

4

5

6

7

1

2

3

4

5

6

7

8

9

10