Fc port assignment fc pass-thru blade, Fc pass-thru blade 2, Primergy bx600 s2 basic unit – FUJITSU PRIMERGY BX600 S2 User Manual
Page 120
120
PRIMERGY BX600 S2 Basic Unit
FC Port Assignment
FC Pass-Thru Blade
©
c
o
g
n
it
as
.
Ge
s
e
lls
c
h
ft
f
ü
r T
e
c
h
n
ik
-Do
k
u
m
e
nt
at
io
n
m
b
H
2
007
P
fad:
H:
\w
in
dows
\_p
roj
e
k
te\
B
x
z
\B
e
tr
ie
b
s
a
n
le
it
un
g\
V
e
rs
ion_
M
a
e
rz
-2
007
\A
rc
h
iv
\B
X
6
0
0
S
2
_
en\
bl
ad
e-u
s
.k
1
0
Configuration with Five 4-way Server Blades
Because a 4-way server blade occupies two slots in the blade server chassis,
there are four connections for four Fibre Channel ports available for a 4-way
server blade. To use these connections, two FC daughter boards must be
installed on the 4-way server blade (see manual for the relevant server blade
type).
The following figure illustrates the assignment of the FC pass-thru blades to the
Fibre Channel ports of the server blades in a configuration with five 4-way
server blades when two FC pass-thru blades and, in each 4-way server blade,
two FC daughter boards are installed in the back of the server.
Figure 73: Fibre Channel port assignment with five 4-way server blades
Server
A B A B A B A B A B A B A B A B A B A B
blade 1
Server
blade 2
Server
blade 3
Server
blade 4
Server
blade 5
FC pass-thru blade 1
1 2 3 4 5 6 7 8 9 10
FC pass-thru blade 2
1 2 3 4 5 6 7 8 9 10