5 regenerative unit replacement, Serviceable parts, Terminal board – Yaskawa R1000 Series Power Regenerative Unit User Manual
Page 131: Serviceable parts terminal board, Regenerative unit replacement

6.5 Regenerative Unit Replacement
YASKAWA ELECTRIC TOEP C710656 08B YASKAWA Power Regenerative Unit - R1000 Instruction Manual
131
Per
iodic Ins
pec
tion
&
Maint
ena
nc
e
6
6.5 Regenerative Unit Replacement
◆ Serviceable Parts
The regenerative unit contains some serviceable parts. The following parts can be replaced over the life span of the
regenerative unit:
• Terminal board I/O PCBs
• Cooling fan (s)
• Front cover
Replace the regenerative unit if the main power circuitry is damaged. Contact your local Yaskawa representative before
replacing parts if the regenerative unit is still under warranty. Yaskawa reserves the right to replace or repair the
regenerative unit according to Yaskawa warranty policy.
WARNING! Electrical Shock Hazard. Do not inspect, connect, or disconnect any wiring while the power is on. Failure to comply can
result in serious personal injury. Before servicing the regenerative unit, disconnect all power to the equipment. The internal capacitor
remains charged even after the power supply is turned off. After shutting off the power, wait for at least the amount of time specified on
the regenerative unit before touching any components.
◆ Terminal Board
The regenerative unit has a modular I/O terminal block that facilitates quick regenerative unit replacement. The terminal
board contains on-board memory that stores all regenerative unit parameter settings and allows the parameters to be saved
and transferred to the replacement regenerative unit. To transfer the terminal board, disconnect the terminal board from
the damaged regenerative unit and reconnect it to the replacement regenerative unit. There is no need to manually
reprogram the replacement regenerative unit after transferring the terminal board.
Figure 6.20
Figure 6.20 Terminal Board
A – Removable terminal board
D – Conduit bracket cover screws
B – Charge LED
E – Conduit bracket mounting screws
C – Conduit bracket
F – Terminal board locking screws
A
B
C
F
D
E
YAI
TOEP_C710656_08B_1_0.book 131 ページ 2015年2月5日 木曜日 午前10時7分