HEIDENHAIN SW 54843x-02 DIN Programming User Manual
Page 540

540
TURN PLUS
7.
2 A
u
to
matic w
o
rk
ing plan g
e
ner
a
tion (A
WG)
Machining sequence for drilling
Main machining
Submachining
Location
Description
Drilling
Contour analysis: Determining the "Hole" form elements.
Sequence – Drilling operations/drilling combinations:
Centering / Centering and countersinking
Drilling
Countersinking / Drilling and countersinking
Reaming / Drilling with reaming
Tapping / Drilling with thread
Sequence – Location:
Centric
Front (also machines Y front)
Lateral surface (also machines Y surface)
– then the elements are machined according to the sequence of
geometrical definition
All
–
All drilling/boring operations at all machining locations
All
Centric
Centric machining of all drilling/boring operations
All
Face
All drilling/boring operations on the front face
All
Lateral
All drilling/boring operations on the lateral surface
Centering, drilling,
countersinking,
reaming, tapping
–
Machining at all machining locations
Centering, drilling,
countersinking,
reaming, tapping
Centric
Centric machining on the face
Centering, drilling,
countersinking,
reaming, tapping
Face
Machining on the face
Centering, drilling,
countersinking,
reaming, tapping
Lateral
Machining on the lateral surface