beautypg.com

0 controls and operation (cont’d) – Reznor LDAP Unit Installation Manual User Manual

Page 30

background image

Form I-LDAP, P/N 207733R6, Page 30

venter motor through post purge, and run the fan motor on heat speed for the

selected delay off time.

Abnormal Heat Cycle Functions (cont’d)

Ignition Retry - If flame is not established on the first trial for ignition period,

the control de-energizes the gas valve and the heat section venter motor and

main venter motor remain energized for an inter-purge period of 10 seconds.

The spark and gas valve are then re-energized, and the control initiates another

trial for ignition.
If flame is not established on the second trial for ignition, the control de-ener-

gizes the gas valve, energizes the fan motor on heat speed, and the heat sec-

tion venter motor and main venter motor remain energized. The fan motor is

shut off after 120 seconds. When the fan motor de-energizes, the spark and

gas valve are re-energized and the control initiates another trial for ignition.

(This fan delay is a self-healing feature for an open auxiliary limit switch).

If flame is not established on the third trial for ignition period, the control de-

energizes the gas valve, and the heat section venter motor and main venter

motor remain energized for an inter-purge period of 10 seconds. The control

then re-energizes the gas valve and spark and initiates another trial for igni-

tion.
If flame is not established on the fourth trial for ignition (initial try plus 3 re-tries),

the control de-energizes the gas valve and goes into lockout. The control goes

to one flash on the green LED to indicate ignition failure lockout.
Limit and High Limit Switch Operation - The high limit and limit switch are

ignored unless a call for heat is present (W energized). If the high limit or limit

switch are open and a call for heat is present, the control de-energizes the gas

valve and turns the fan motor on heat speed and runs the heat section venter

motor and the main venter motor.
When the switch re-closes or the call for heat is lost, the control runs the heat

section venter motor and main venter motor through post purge and runs the

fan motor through the selected fan off delay. The control will return to normal

operation after fan off delay is completed.
Heat Section Pressure Switch (all sizes) and Main Combustion Air Pres-

sure Switch (Sizes 800 and 1200) - If the heat section pressure switch or

main combustion air pressure switch opens before the trial for ignition period,

the heat section venter motor and main venter motor will run through the heat

section pressure switch and main combustion air pressure switch recognition

delay (2 seconds), the gas valve will be de-energized, and the heat section

venter motor and main venter motor will run through the postpurge time. The

control will re-start the heat cycle at the heat section pressure switch and main

combustion air pressure switch proving state if the call for heat still exists.
Heat section pressure switch or main combustion air pressure switch opening

for less than 2 seconds during the trial for ignition period shall not interrupt the

heat cycle. (Gas valve will de-energize while the heat section pressure switch

and main combustion air pressure switch is open.)
If the heat section pressure switch or main combustion air pressure switch

opens after a successful ignition, the control will de-energize the gas valve. If

flame is lost before the end of the 2 second pressure switch recognition delay,

the control will respond to the loss of flame. If the heat section pressure switch

and main combustion air pressure switch remains open for 2 seconds and the

flame remains, the control de-energizes the gas valve, the heat section venter

motor and main venter motor runs through postpurge, and the fan motor runs

on heat speed through the selected fan off delay. When the fan off delay is

8.0 Controls and

Operation

(cont’d)

8.5 Ignition System

(cont’d)