Chapter 6 installing vent, air intake & drain, Danger, Warning – AERCO Esteem O&M Manual User Manual
Page 33: 27 installing vent and combustion air intake, Installing condensate drain assembly, Gf-125
27
Installing Vent and Combustion Air
Intake
DANGER!
T
HE
E
STEEM
399 L
OW
NO
X
MUST
BE
VENTED
AND
SUPPLIED
WITH
COMBUSTION
AIR
AS
SHOWN
IN
THE
E
STEEM
399 L
OW
NO
X
V
ENT
S
UPPLE
-
MENT
,
INCLUDED
IN
THE
BOILER
INSTALLATION
ENVELOPE
. R
EFER
TO
VENT
KIT
INSTRUCTIONS
(GF-125V)
FOR
ADDITIONAL
VENT
INSTALLA
-
TION
INSTRUCTIONS
. O
NCE
INSTALLATION
IS
COMPLETE
,
INSPECT
THE
VENT
AND
COMBUS
-
TION
AIR
SYSTEM
THOROUGHLY
TO
ENSURE
SYSTEMS
ARE
AIRTIGHT
AND
COMPLY
WITH
THE
INSTRUCTIONS
GIVEN
IN
THE
VENTING
SUPPLE
-
MENT
AND
ARE
WITHIN
ALL
REQUIREMENTS
OF
APPLICABLE
CODES
. F
AILURE
TO
COMPLY
WITH
ALL
INSTALLATION
REQUIREMENTS
CAN
CAUSE
SEVERE
PERSONAL
INJURY
OR
DEATH
.
Installing Condensate Drain
Assembly
1. Locate the condensate drain assembly
and install as shown in Figure 16, page 28.
N
OTICE
The installer may want to fi ll the con-
densate trap with water prior to assem-
bling on the unit.
2. Remove the retaining nut and rubber seal
from the condensate drain assembly and
slide over the heat exchanger condensate
drain nipple. Connect the condensate
drain assembly to the retaining nut and
tighten. Hand tight only!
WARNING!
E
NSURE
THE
CONDENSATE
DRAIN
ASSEMBLY
CONTAINS
THE
PLASTIC
SEATED
BALL
. D
O
NOT
INSTALL
THE
CONDENSATE
DRAIN
ASSEMBLY
IF
THE
BALL
IS
LOST
OR
MISSING
,
REPLACE
THE
ENTIRE
ASSEMBLY
.
3. Remove the compression nut and rubber
seal from the drain outlet.
4. Using 3/4” x 2’ flexible PVC tube provid-
ed, slide the compression nut and rubber
seal over the pipe
N
OTICE
The use of 3/4” PVC or CPVC pipe is
also acceptable. If 3/4” pipe is used de-
burr and chamfer pipe to allow mating
onto the drain assembly.
5. Thread the rubber seal into the compres-
sion nut to ease installation of the pipe to
the drain assembly.
6. Seat the pipe onto the drain assembly
and tighten the compression nut. Hand
tight only!
N
OTICE
The installer may opt to using 13/16” ID
tubing in lieu of rigid piping.
N
OTICE
The drain line materials must be mate-
rials approved by the authority having
jurisdiction. In absence of such author-
ity, PVC and CPVC piping must com-
ply with ASTM D1785 or D2845. The
cement and primer used on the pip-
ing must comply with ASME D2564 or
F493. For installations in Canada, use
CSA or ULC certifi ed PVC or CPVC
pipe, fi ttings and cement/primer.
7. Continue the pipe from the drain assem-
bly to a floor drain or condensate pump.
N
OTICE
When selecting and installing a con-
densate pump, ensure the pump is ap-
proved for use with condensing boil-
ers and furnaces. The pump should
be equipped with an overfl ow switch to
prevent property damage from potential
condensate spillage.
8. The Esteem 399 Low NOx will typically
produce a condensate that is considered
Chapter 6
Installing Vent, Air Intake & Drain
GF-125