beautypg.com

Chapter 6 installing vent, air intake & drain, Danger, Warning – AERCO Esteem O&M Manual User Manual

Page 33: 27 installing vent and combustion air intake, Installing condensate drain assembly, Gf-125

background image

27

Installing Vent and Combustion Air
Intake

DANGER!

T

HE

E

STEEM

399 L

OW

NO

X

MUST

BE

VENTED

AND

SUPPLIED

WITH

COMBUSTION

AIR

AS

SHOWN

IN

THE

E

STEEM

399 L

OW

NO

X

V

ENT

S

UPPLE

-

MENT

,

INCLUDED

IN

THE

BOILER

INSTALLATION

ENVELOPE

. R

EFER

TO

VENT

KIT

INSTRUCTIONS

(GF-125V)

FOR

ADDITIONAL

VENT

INSTALLA

-

TION

INSTRUCTIONS

. O

NCE

INSTALLATION

IS

COMPLETE

,

INSPECT

THE

VENT

AND

COMBUS

-

TION

AIR

SYSTEM

THOROUGHLY

TO

ENSURE

SYSTEMS

ARE

AIRTIGHT

AND

COMPLY

WITH

THE

INSTRUCTIONS

GIVEN

IN

THE

VENTING

SUPPLE

-

MENT

AND

ARE

WITHIN

ALL

REQUIREMENTS

OF

APPLICABLE

CODES

. F

AILURE

TO

COMPLY

WITH

ALL

INSTALLATION

REQUIREMENTS

CAN

CAUSE

SEVERE

PERSONAL

INJURY

OR

DEATH

.

Installing Condensate Drain
Assembly

1. Locate the condensate drain assembly

and install as shown in Figure 16, page 28.

N

OTICE

The installer may want to fi ll the con-
densate trap with water prior to assem-
bling on the unit.

2. Remove the retaining nut and rubber seal

from the condensate drain assembly and
slide over the heat exchanger condensate
drain nipple. Connect the condensate
drain assembly to the retaining nut and
tighten. Hand tight only!

WARNING!

E

NSURE

THE

CONDENSATE

DRAIN

ASSEMBLY

CONTAINS

THE

PLASTIC

SEATED

BALL

. D

O

NOT

INSTALL

THE

CONDENSATE

DRAIN

ASSEMBLY

IF

THE

BALL

IS

LOST

OR

MISSING

,

REPLACE

THE

ENTIRE

ASSEMBLY

.

3. Remove the compression nut and rubber

seal from the drain outlet.

4. Using 3/4” x 2’ flexible PVC tube provid-

ed, slide the compression nut and rubber
seal over the pipe

N

OTICE

The use of 3/4” PVC or CPVC pipe is
also acceptable. If 3/4” pipe is used de-
burr and chamfer pipe to allow mating
onto the drain assembly.

5. Thread the rubber seal into the compres-

sion nut to ease installation of the pipe to
the drain assembly.

6. Seat the pipe onto the drain assembly

and tighten the compression nut. Hand
tight only!

N

OTICE

The installer may opt to using 13/16” ID
tubing in lieu of rigid piping.

N

OTICE

The drain line materials must be mate-
rials approved by the authority having
jurisdiction. In absence of such author-
ity, PVC and CPVC piping must com-
ply with ASTM D1785 or D2845. The
cement and primer used on the pip-
ing must comply with ASME D2564 or
F493. For installations in Canada, use
CSA or ULC certifi ed PVC or CPVC
pipe, fi ttings and cement/primer.

7. Continue the pipe from the drain assem-

bly to a floor drain or condensate pump.

N

OTICE

When selecting and installing a con-
densate pump, ensure the pump is ap-
proved for use with condensing boil-
ers and furnaces. The pump should
be equipped with an overfl ow switch to
prevent property damage from potential
condensate spillage.

8. The Esteem 399 Low NOx will typically

produce a condensate that is considered

Chapter 6

Installing Vent, Air Intake & Drain

GF-125