beautypg.com

Chapter 4 unit preparations, Warning, 14 handling instructions – AERCO Esteem O&M Manual User Manual

Page 20: Wall mounting installation, Wall mounting guidelines, Stud wall installation, Gf-125

background image

14

Handling Instructions

The Esteem 399 Low NOx is generally easier
to handle and maneuver once removed from
the shipping carton.

To remove the shipping carton:

C

AUTION

Use care not to lift the unit from, or
place the unit on the front plastic con-
trol panel, damage can occur. Use care
not to drop, bump or rotate the boiler
upside down, as damage to the boiler
will result.

1. Remove any shipping straps and open

the side of the shipping carton.

2. Slide the unit with the foam inserts out of

the carton.

3. Discard all packing materials.

Wall Mounting Installation

The Esteem 399 Low NOx should be wall
mounted using the bracket provided with
the boiler. The Esteem 399 Low NOx is not
designed for floor installation. If floor installa-
tion is required an optional floor stand is avail-
able through AERCO International.

WARNING

T

HE

WALL

USED

FOR

MOUNTING

THE

E

STEEM

399 L

OW

NO

X

MUST

BE

VERTICALLY

PLUMBED

AND

CAPABLE

OF

SUPPORTING

A

MINIMUM

250

POUNDS

[115 K

G

]

FOR

E

STEEM

399 L

OW

NO

X

. F

AILURE

TO

COMPLY

WITH

THESE

REQUIRE

-

MENTS

COULD

RESULT

IN

PERSONAL

INJURY

,

DEATH

OR

SUBSTANTIAL

PROPERTY

DAMAGE

.

Wall Mounting Guidelines

• The boiler is heavy and bulky. A minimum

of 2 people is required for mounting the
boiler.

• DO NOT mount or attempt to mount the

wall bracket to hollow sheet rock or lath

walls using anchors. Only install boiler to
studs or equivalent wood structure.

• The wall-mounting bracket is designed

for stud spacing of 12 inch or 16 inch on
centers. For unconventional stud spacing,
a solid / secure mounting surface must be
provided for installation of the bracket.

• For mounting on wood studs, install the

bracket using the lag screws provided with
the boiler. Ensure both lag screws are
installed securely in the studs.

• For mounting on metal studs, install the

bracket to the studs using 3/16” toggle
bolts and washers.

• For mounting on solid walls (rock, concrete,

brick, cinder block, etc.), install the wall
bracket using anchors (double expansion
shields) and bolts with washers provided
with the boiler.

WARNING

U

SE

EXTREME

CARE

NOT

TO

DROP

THE

BOILER

OR

CAUSE

BODILY

INJURY

WHILE

LIFTING

OR

MOUNTING

THE

BOILER

ONTO

THE

BRACKET

.

O

NCE

MOUNTED

VERIFY

THAT

THE

BOILER

IS

SECURELY

ATTACHED

TO

THE

BRACKET

AND

WALL

. F

AILURE

TO

COMPLY

WITH

THE

ABOVE

GUIDELINES

COULD

RESULT

IN

PROPERTY

DAM

-

AGE

,

PERSONAL

INJURY

OR

DEATH

.

Stud Wall Installation

• To distribute the weight of the boiler evenly

when mounting onto a stud wall it is rec-
ommended to use the Esteem 399 Low
NOx Wall Frame kit.

• When using the wall frame to mount the

boiler reference the kit installation instruc-
tions and ensure the frame is securely
fastened to the wall.

• If the structure of wall is questionable,

in supporting a minimum weight of 250
pounds [115 kg.], it is recommended to use
the optional fl oor stand.
Wall Bracket Installation - Solid Walls

Chapter 4

Unit Preparations

GF-125