5

Boiler Replacement

Boiler Replacement

If the Esteem 399 Low NOx is replacing an
existing boiler, the following items should be
checked and corrected prior to installation:

• Boiler piping leaks and corrosion.

• Improper location and sizing of the

expansion tank on the boiler heating
loop.

• If applicable, level and quality of freeze

protection within the boiler system.

See Warning on ”Handling Previously Fired
Combustion Chamber Insulation” on page 67

Recommended Clearances

The Esteem 399 Low NOx is approved for
zero clearance to combustibles, excluding
vent and boiler piping.

• Boiler Piping - 1/4 inch from combustible

materials.

• See Concentric Vent System Installation

Supplement GF-125V for vent clearance
requirements.

To provide service access to the unit it is rec-
ommended that the following clearances be
maintained:

Top jacket

24 inches [610 mm].

Front

24 inches [610 mm].

Rear

0 inches

Sides

6 inches [153 mm]

Bottom piping

24 inches [610 mm].

WARNING

I

F

THE

CLEARANCES

LISTED

ABOVE

CANNOT

BE

MAINTAINED

OR

THE

ENCLOSURE

IN

WHICH

THE

BOILER

IS

INSTALLED

IS

LESS

THAN

85

CUBIC

FEET

,

THE

SPACE

MUST

BE

VENTILATED

. S

EEP

-

AGE

8

FOR

REQUIREMENTS

.

GF-125