Synchronize central stations, client-server only – Welch Allyn Connex CS Central Station & Server - User Manual User Manual
Page 163

Connex CS Admin Guide
Moving from Test to Production
157
Synchronize central stations, client-server only
1.
At each central station, including and Warm Spare station, use the Windows
Services tool to start Welch Allyn Connex CS services on the central station PC. Start
services in the following order:
•
Connex Client Services
•
License Service
•
Continuous Connectivity Services
•
Alarm Gateway Service
•
ADT Task Scheduler Service
•
Network Rendezvous Service
•
Trend Data Exporter Service
•
Data Synchronization Service
•
Process Monitor Service (if present)
2.
Wait 30 minutes (minimum). This will give time for the database changes (deletes) to
synchronize with all the central stations.
The amount of time necessary for the synchronization to occur may vary
depending on the amount of data to be synchronized and the number of central
stations in the environment.
3.
Verify that each central station has synchronized with the Connex server database.
This can be verified by performing any of the following on each central station:
a.
Within the Connex CS Application, navigate to the Patient list > Search tab and
perform a patient search. The resulting list should return zero (0) records.
b.
From the SSMS tool, open the file CS1.2_CustomerPurge_Verification.sql, and
click on
or press the F5 key to run the script. After a few moments,
the script output appears in a grid view table near the bottom of the working
window.
Note