Product change, 1 product change specifications, 11 product change – Banner PresencePLUS P4 GEO 1.3 Series User Manual
Page 223
11
Product Change
This section explains the Product Change (pin 3) input.
The Product Change input is used in conjunction with one of the four I/O points programmed as Product Select lines.
The inspection loaded will be executed following a valid trigger.
• The Product Change input responds to the leading edge transition of a pulse greater than 1 millisecond.
• The Product Select input is pulsed to correspond to a program location. For example, five pulses will
load program #5.
11.1 Product Change Specifications
Current Sourcing (PNP)
Current Sinking (NPN)
State
> 8V at -7.5 mA max.
< 2V at 1 mA max.
ON
< 2V at -7.5 mA max.
> 10 V at 4 mA max.
OFF
One of the four I/O on the System Setup InputOutput tab must be programmed for Product Select if Product
Change is to be used.
223
Banner Engineering Corp. - Minneapolis, MN USA - www.bannerengineering.com
Tel: 763.544.3164
P/N 000000