Perform a peak test with the dummy cell – Metrohm 757 VA Computrace User Manual
Page 168
![background image](/manuals/586553/168/background.png)
7 How to ...?
757 VA Computrace – Software
158
Perform a peak test with the dummy cell
For testing the peak measurement, the dummy cell of the 757 VA
Computrace Stand is used with the test method
Test757_D.mth
.
Proceed as follows:
1. Click on
or
MAIN WINDOW
/ Mode / Determination
.
2. Click on
or
MAIN WINDOW
/ Window / Working method
specification
to open the
WORKING METHOD SPECIFICATIONS
window.
3. Click on
or
MAIN WINDOW
/ File / Load method
.
4. Select the method file
Test757_D.mth
in the
OPEN
window and
click
. The method is loaded into the
WORKING METHOD
SPECIFICATIONS
window.
5. Connect the dummy cell at the 757 VA Computrace Stand: At-
tach electrode cable AE to clamping screw
AE, attach elec-
trode cable RE to clamping screw
RE, attach electrode cable
WE to clamping screw
WE-D.
6. Click on
or
MAIN WINDOW
/ Window / Monitor
to open the
MONITOR
window.
7. Start the measurement by clicking the
icon in the
MAIN
WINDOW
or the
button in the
MONITORING
window.
8. Enter the
Sample ID
(used as part of the determination file
name) in the
PLACE SAMPLE
window and click
.
9. At the end of the measurement, a curve is printed out. This
curve should satisfy the following conditions:
• A symmetrical, gaussian-shaped peak should be
plotted. The evaluation must provide a result for the
peak voltage and the peak current, which are printed
out in the full report.
• The peak voltage E should be -450 … -550 mV.