beautypg.com

Required tools and equipment, Procedures, Required tools and equipment procedures – Rockwell Automation 1747-L5xx SLC 500 Modular Hardware Style User Manual User Manual

Page 16

background image

Publication 1747-UM011G-EN-P - June 2008

16

Quick Start for Experienced Users

Required Tools and
Equipment

Have the following tools and equipment ready:

Medium blade screwdriver

Programming equipment

Compatible communication cable and/or interface (The table
below indicates with an X, which cables are compatible with the
SLC 5/01 through 5/05 processors.)

Procedures

Network Interface

Processor

SLC 5/01

SLC 5/02

SLC 5/03

SLC 5/04

SLC 5/05

1747-UIC

X

(1)

(1)

Requires 1747-C13 cable.

X

(1)

X

(1)(4)

(4)

Requires 1747-CP3 cable.

X

(4)

X

(4)

1747-PIC

X

X

X

1747-CP3

X

X

X

1784-PKTX(D)

X

(2)

(2)

Requires 1784-CP14 cable.

X

(2)

X

(2)

X

1784-PCMK

X

(3)

(3)

Requires 1784-PCM4 cable.

X

(3)

X

(3)

X

(5)

(5)

Requires 1784-PCM6 cable.

10/100Base-T Ethernet

X

1.

Check the contents of the shipping box.

Reference

Unpack the shipping boxes making sure that the contents include:

SLC 500 modular processor

installation instructions (publication 1747-IN009)

SLC 500 modular chassis (catalog numbers 1746-A4, 1746-A7, 1746-A10, or
1746-A13)

installation instructions (publication 1746-IN016)

SLC 500 modular power supplies (catalog numbers 1746-P1, 1746-P2,
1746-P3, 1746-P4, 1746-P5, 1746-P6, or 1746-P7)

installation instructions (publication 1746-IN004)

If the contents are incomplete, call your local Rockwell Automation representative
for assistance.