beautypg.com

Rockwell Automation 1747-L5xx SLC 500 Modular Hardware Style User Manual User Manual

Page 124

background image

Publication 1747-UM011G-EN-P - June 2008

124

Starting Up Your Control System

2. Turn on the programming device.

3. Configure the controller.

4. Name the program. (Becomes the processor name when

downloaded.)

5. Program a sample test rung not affecting machine operation.

6. Save the program and controller configuration.

7. Transfer the controller configuration and sample test program to

the processor. After the new program is transferred to the
processor, the CPU FAULT status indicator should clear. The CPU
FAULT (or FLT on the SLC 5/03, SLC 5/04, and SLC 5/05
processor) status indicator stops if it was flashing.

8. Enter the Run mode.

The processor RUN status indicator should turn on, indicating
that the controller is in the Run mode with no CPU faults. If any
other CPU status exists, refer to chapter 10 for recommended action.

9. Monitor and exercise simple test rung.

If a simple test rung operates successfully without CPU faults,
you may assume basic processor functions are properly functioning. If
any other processor status exists, refer to chapter 10 for recommended
action.

ATTENTION

These steps are covered more extensively in your

programming software and Hand-held Terminal user

manuals. Reference these manuals if you have a

problem completing one of the steps.