6 commissioning, 1 before initial switch-on, Commissioning – Lenze E84AYCET EtherCAT MCI module User Manual
Page 33: Before initial switch-on, 6commissioning
Lenze · E84AYCET communication module (EtherCAT) · Communication Manual · DMS 5.0 EN · 05/2013 · TD17
33
6
Commissioning
6.1
Before initial switch-on
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6
Commissioning
During commissioning, plant-specific data such as motor parameters, operating parameters,
responses, and parameters for fieldbus communication are defined for the inverter. Lenze devices
use codes for this purpose.
The codes of the inverter and for communication are saved to the memory module in a non-volatile
data set.
In addition, there are codes for diagnosing and monitoring the stations.
Parameters of the communication module
6.1
Before initial switch-on
Stop!
Before you switch on the Inverter Drive 8400 and the communication module for the
first time, check the entire wiring for completeness, short circuit and earth fault.