Initial operation – Leica Biosystems TP1020 User Manual
Page 28

28
Instructions for Use V 2.9 RevC, English – 12/2013
4.
Initial Operation
• To lift up the instrument take it by the reagent
container platform or by the lower end of the
housing (Fig. 11) and lift it from the base plate
(8).
• Place the instrument on a stable laboratory
table.
Four rollers (12) under the instrument housing
permit rotating the instrument on the bench.
• Remove the sponge rubber transport safety
device (9) from under the carousel cover (11).
Fig. 11
12
Unpacking
(continued)
11
When transporting the instrument, do
not lift it up by the carousel cover!
For further secure transport of the in-
strument we recommend you keep the
original packaging material.
See also other documents in the category Leica Biosystems Equipment:
- SM2010 R (46 pages)
- CM305 S (66 pages)
- CE Knife holder (14 pages)
- CM1950 (78 pages)
- VT1200/VT1200 S (62 pages)
- VT1000 S (42 pages)
- HI1220 (18 pages)
- HI1210 (18 pages)
- CM1850 UV (56 pages)
- CM1850 UV (54 pages)
- CM1510-S (56 pages)
- CM3600 XP (114 pages)
- CM1100 (36 pages)
- CM1860/CM1860 UV (98 pages)
- Premium blade holder (14 pages)
- CM1520 (92 pages)
- VT1000 A (49 pages)
- VT1000 P (48 pages)
- SP2600 (51 pages)
- SM2500 (76 pages)
- SM2400 (8 pages)
- SM2000R (22 pages)
- EG1160 (32 pages)
- EG1150 C (20 pages)
- EG1150 H (42 pages)
- EG1130 (2 pages)
- EG1120 (2 pages)
- EG F (18 pages)
- ASP300 (70 pages)
- PELORIS_PELORIS II (160 pages)
- ASP200 S (88 pages)
- ASP300 S (88 pages)
- ASP6025 (178 pages)
- LN22 (44 pages)
- RM CoolClamp (20 pages)
- RM2265 (88 pages)
- RM2255 (82 pages)
- RM2245 (78 pages)
- RM2235 (78 pages)
- RM2125 RTS (60 pages)
- SP9000 (30 pages)
- SP1600 (10 pages)
- ST4040 (50 pages)
- ST5020 (88 pages)