beautypg.com

Framing diagram – Hired-Hand Mega-Cool rev 6-09 User Manual

Page 7

background image

Part No. 4801-5120 Rev. 6-09

Mega-Cool System

Page 7
























Installation Cross-Section (Systems 10

'

to 120

'

)







NOTE: 2x6 refers to U. S. finished
lumber measurements.

Framing Diagram For 10' To 120 Ft. Center-Mount Systems

Splash Guard

Minimum Clearance

6 inches from roof

Cover

Back-Plate

Support Bracket

Drip Rail

8” Pipe

Support

Bracket

2" x 6" Board or Equivalent
or Steel Equivalent. See Page 5.

BackPlate

Post

Pad

(End-Cap

not shown)

"A"

Pad Heig

ht

Bottom

Flashing

12"(30.5 cm) for 4" pad
11"(27.9 cm) for 6" pad

"B"

9.5" (24.1 cm) Minimum

Rou

gh Op

eni

ng

"C"

1. Drawing shown to the right is an overview of
a completed Mega Cool Center-Mounted Pump
System without the left end cap.

2. The figure details the overall dimensions for
each pad system and minimum clearance from
roof.

Dimension ("A")

(6” PAD)

(4” PAD)

4 ft Pad

61 1/8 in.

155.23 cm

62 1/8 in.

157.80 cm

5ft Pad

73 1/8 in.

185.74 cm

74 1/8 in.

188.23 cm

6ft Pad

85 1/8 in.

216.22 cm

86 1/8 in.

218.76 cm

Rough Opening Dimension ("B")

(6” PAD)

(4” PAD)

4 ft Pad

49 1/8 in.

124.78 cm

50 1/8 in.

127.32 cm

5ft Pad

61 1/8 in.

155.26 cm

62 1/8 in.

157.80 cm

6ft Pad

73 1/8 in.

185.74 cm

74 1/8 in.

188.23 cm

Dimension ("C")

(6” PAD)

(4” PAD)

4 ft Pad

50 1/8 in.

127.32 cm

51 1/8 in.

129.85 cm

5ft Pad

62 1/8 in.

157.80 cm

63 1/8 in.

160.34 cm

6ft Pad

74 1/8 in.

188.28 cm

75 1/8 in.

190.82 cm

Splash Guard

Support Bracket

Shown with In-Line

Pump Option

Framing Diagram

Note: Air Flow
up behind
Back Plate
between
posts.

Post

Back-
Plate
Support
Bracket

6

Overall