beautypg.com

Hired-Hand Mega-Cool rev 6-09 User Manual

Page 33

background image

Part No. 4801-5120 Rev. 6-09

Mega-Cool System

Page 33






































INSTRUCTIONS - Connect Pump to Spray Line

NOTE: The total vertical height of pipe sections in the
following instructions must reach from Sump Pump to level
of spray line. Adjust lengths of pipe sections as required
for proper height. For proper alignment, cut and assemble
all pieces of pipe and fittings before gluing together.

1. Cut pieces of 1 ½" pipe supplied to lengths needed and glue
together with appropriate fittings called out as shown at the left.
When cutting pieces of 1 ½" pipe, notice that the pump supply
line must rest in slotted pipe and align with 8" pipe as shown in
the Figure on Page 30.

2. Next, assemble remaining supply line assembly as shown at
the left using fittings called out and 1 ½" pipe supplied. Cut 1 ½"
pipe into necessary lengths required. When gluing all pieces
together be sure that bottom part of supply line assembly
containing filter is rotated to properly align and connect with
pump supply line extending from slotted pipe at top of Tee-Tank
assembly.

3. Once assembled, align and connect all supply lines as shown
on Pages 30 and 31.








12” PVC

1 ¼" to 1

½"

Reducer

Filter

Pump

1 ½"Male
Threaded
Union

1 ½" 90º
Elbow

Threaded Union

12"x12" Pipe with cut
channel

12"x8" Tee

8"x22 ½ º
Elbow

12"

Bottom Cap

12"x3'

Reservoir
and Pump

1 ½" to 1"
Reducing Tee

1 ½" Ball Valve
(Primary Flow
Regulator)

Ground Level

NOTE: The Pump housing is designed to be
installed below ground level.

1 ½" 90º
Elbow

½"x90º

Elbow

Drain Support
Brackets

1" Ball

Valve

½" Threaded

Coupling

Mega-Cool Sump Pump Assembly