beautypg.com

Hired-Hand Mega-Cool rev 6-09 User Manual

Page 36

background image

Part No. 4801-5120 Rev. 6-09

Mega-Cool System

Page 36












































INSTRUCTIONS - Connect Pump to Spray Line

NOTE: The total vertical height of pipe sections in the
following instructions must reach from Sump Pump to
level of spray line. Adjust lengths of pipe sections as
required for proper height. For proper alignment, cut
and assemble all pieces of pipe and fittings before
gluing together.


1. Cut pieces of 1 ½" pipe supplied to lengths needed and glue

together with appropriate fittings called out as shown at the
left. When cutting pieces of 1 ½" pipe, notice that the pump
supply line must rest in slotted pipe and align with 8" pipe as
shown.


2. Next, assemble remaining supply line assembly as shown at

the left using fittings called out and 1 ½" pipe supplied. Cut 1
½" pipe into necessary lengths required. When gluing all
pieces together be sure that bottom part of supply line
assembly containing filter is rotated to properly align and
connect with pump supply line extending from slotted pipe at
top of Tee-Tank assembly.


3. Once assembled, align and connect all supply lines as shown

on Pages 33 and 34.












Sump Pump Side View

Filter

12”PVC

Cap

1 ½" 90º

Elbow

Threaded
Union

12"x12" Pipe with cut

channel

12"x8" Tee

12"

Bottom Cap

12"x3'

Reservoir

1 ½" to 1"
Reducing Tee

1 ½" Ball Valve
(Primary Flow
Regulator)

1 ½" 90º

Elbow

½"x90º

Elbow

Drain Support
Bracket

1" Ball Valve

NOTE: The Pump housing is designed to be installed below ground level.