beautypg.com

Install bottom flashing and drip rails, Front view side view (center-mount system only) – Hired-Hand Mega-Cool rev 6-09 User Manual

Page 12

background image

Part No. 4801-5120 Rev. 6-09

Mega-Cool System

Page 12






























































Install Bottom Flashing and Drip Rails

1.

Place bottom flashing and drip rails along the cut in the pipe as shown.

NOTE: If a Center-Mount In-Line Pump System is being installed, the high-

end drip rail should be installed as shown at left. The high-end drip
rail will ship with the center-mount In-Line Pump supply kit. Refer to
Supply Kit Numbers shown on Page 39.

2.

Secure the bottom flashing to the columns and stringers as shown.





Front View

Side View

(Center-Mount System ONLY)

High-End Drip Rail for
Center-Mount 8” Tee

Place the short side

toward the wall.

Pipe

Screw
(Attach on 5’
Centers)

Drip Rail

Flashing

Secure Flashing
and Insert Drip
Rail Into Pipe)