beautypg.com

6 operation, Operation -1, 6operation – Yokogawa FieldMate User Manual

Page 33

background image

<6 OPERATION>

6-1

IM 01R01A11-01EN

6

OPERATION

This chapter describes how to use Verification Tool.
For details of the verification procedure, see 6.2 and 6.3.

NOTE

• Be sure to run Standard VF.
• “Overall Status” in “Result” is carried out only when “Standard VF” is complete. When

“Standard VF” is not complete, “Overall Status” is left blank.

• “Result sheet” can be printed even when “Standard VF” is not complete.