beautypg.com

4 start-up from fieldmate, Start-up from fieldmate -1, 4start-up from fieldmate – Yokogawa FieldMate User Manual

Page 17

background image

<4 START-UP FROM FieldMate>

4-1

IM 01R01A11-01EN

4

START-UP FROM FieldMate

Verification Tool can be started by the following:

■ From “Segment Viewer” (FieldMate is online to AXF), see 4.1.
■ From “Device Navigator”, see 4.2.
■ From “Verification Data” in “Device Maintenance Info”, see 4.3.
■ From “History”, see 4.4.

Select the start-up procedure depending on the items to be verified and connection status be-
tween FieldMate and AXF.

NOTE

• To run Verification Tool in “online” mode, start the Verification Tool from “Segment Viewer”.
• To complete Standard VF, start Verification Tool from “Segment Viewer”.

4.1 Segment Viewer

4.3 Verification Data

in “Device Maintenance Info”

4.4 History

6.3 Enhanced VF

(Optional)

6.2 Standard VF

(Mandatory)

6.4 Result

FieldMate and AXF

Online

Offline

Verification Tool and AXF:

Offline

Verification Tool and AXF:

Online

IMP

OS

SIB

LE

IMP

OS

SIB

LE

4.2 Device Navigator

F040101.ai

Figure 4.1.1 “Start-up” Procedure