4 start-up from fieldmate, Start-up from fieldmate -1, 4start-up from fieldmate – Yokogawa FieldMate User Manual
Page 17
<4 START-UP FROM FieldMate>
4-1
IM 01R01A11-01EN
4
START-UP FROM FieldMate
Verification Tool can be started by the following:
■ From “Segment Viewer” (FieldMate is online to AXF), see 4.1.
■ From “Device Navigator”, see 4.2.
■ From “Verification Data” in “Device Maintenance Info”, see 4.3.
■ From “History”, see 4.4.
Select the start-up procedure depending on the items to be verified and connection status be-
tween FieldMate and AXF.
NOTE
• To run Verification Tool in “online” mode, start the Verification Tool from “Segment Viewer”.
• To complete Standard VF, start Verification Tool from “Segment Viewer”.
4.1 Segment Viewer
4.3 Verification Data
in “Device Maintenance Info”
4.4 History
6.3 Enhanced VF
(Optional)
6.2 Standard VF
(Mandatory)
6.4 Result
FieldMate and AXF
Online
Offline
Verification Tool and AXF:
Offline
Verification Tool and AXF:
Online
IMP
OS
SIB
LE
IMP
OS
SIB
LE
4.2 Device Navigator
F040101.ai
Figure 4.1.1 “Start-up” Procedure