beautypg.com

Deflation test – ZOLL Propaq MD Rev A User Manual

Page 44

background image

C

HAPTER

1

M

AINTENANCE

T

ESTS

40

9650-0807-01 Rev. A

Deflation Test

Equipment

Dual lumen NIBP hose, stop watch, NIBP simulator

Do This...

Observe This...

Pass/Fail

1.

From the Propaq MD NIBP Test control
panel, use the navigation keys to select:

Close Valve

Turn Pump On

2.

Monitor the pressure reported by the
NIBP Test control panel or the external
pressure standard, and select Turn Pump
Off
as soon as the pressure reaches the
target pressure of 265 +/- 5 mmHg.

3.

Allow the system to stabilize for 5
seconds.

4.

Use the navigation keys to select Open
Valve
and immediately start the timer.

5.

Stop the timer as soon as pressure drops
below 15 mmHg.

The pressure should drop within 10
seconds.

o

o