beautypg.com

ZOLL Propaq MD Rev A User Manual

Page 41

background image

Maintenance Tests

9650-0807-01 Rev. A

Propaq MD Service Manual

37

11.

From the Propaq MD NIBP Test control
panel, use the navigation keys to select:

Close Valve

Turn Pump On

12. Monitor the pressure reported by the

external pressure standard.

13. Once the pressure reaches the target

pressure of 150 +/- 5 mmHg, use the
navigation keys to select Turn Pump Off.

14. Allow the system to stabilize for at least

10 seconds.

15. Verify that the primary transducer agrees

with the reading on the NIBP simulator.

Reading should be within 3mmHg.

o

o

16. Verify that the safety transducer agrees

with the reading on the NIBP simulator.

Reading should be within 4mmHg.

o

o

17. From the NIBP Test control panel, select

Open Valve to release the pressure.

18. From the Propaq MD NIBP Test control

panel, use the navigation keys to select:

Close Valve

Turn Pump On

19. Monitor the pressure reported by the

external pressure standard.

20. Once the pressure reaches the target

pressure of 250 +/- 5 mmHg, use the
navigation keys to select Turn Pump Off.

21. Allow the system to stabilize for at least

10 seconds.

22. Verify that the primary transducer agrees

with the reading on the NIBP simulator.

Reading should be within 3mmHg.

o

o

23. Verify that the safety transducer agrees

with the reading on the NIBP simulator.

Reading should be within 4mmHg.

o

o

24. From the NIBP Test control panel, select

Open Valve to release the pressure.

25. Once complete, use the navigation keys to

select Update NIBP Cal Check Date to
save the date of the most recent
calibration check.
Note: This will reset the date. Nothing
displays on the screen.

Do This...

Observe This...

Pass/Fail