beautypg.com

Etco, Calibration (required for annual calibration) – ZOLL Propaq MD Rev A User Manual

Page 36

background image

C

HAPTER

1

M

AINTENANCE

T

ESTS

32

9650-0807-01 Rev. A

EtCO

2

Calibration (required for annual calibration)

Equipment

5% CO

2

calibration gas cylinder with CO

2

sample line (kit available from Scott Medical

Products, PN 4653ORF-BD)

Do This...

Observe This...

Pass/Fail

1.

Turn on the Propaq MD unit.

2.

On the Propaq MD unit, select
Supervisor>Service>Diagnostic>CO

2

>

Calibration to enter the CO

2

Calibration

control panel.

3.

Connect the Propaq MD unit to the 5%
CO

2

calibration gas cylinder using the

sample line included with the calibration
kit.

4.

From the CO

2

Calibration Menu, select

Calibration.

5.

Activate the calibration gas flow by
pressing the top valve on the calibration gas
canister.

6.

Continue to apply the calibration gas until the
status in the CO

2

Calibration control panel

displays: CALIBRATION GAS CAN BE
REMOVED
.

When the calibration is complete, the
status in the CO

2

Calibration control panel

displays: CALIBRATION DONE-OK

The calibration date will be updated upon
exiting the CO

2

Test control panel.

o

o

o

o