beautypg.com

Modem pooing testing, Modem pooling testing – AT&T AUDIX Networking 585-300-903 User Manual

Page 141

background image

DCP Mode 2 Installation and Administration

11-23

_

______________________________________________________________________________________

_

______________________________________________________________________________________

_

______________________________________________________________________________________

5. Procedure 180, Word 1:

a. Enter the digital trunk group number (tgroup1) in Field 1.

b. Set Digital Equipment Location to one of the digital trunk circuits (Fields 3 through 7).

c. Set Analog Trunk Group to the analog trunk group number (Field 8).

d. Set Analog Equipment Location to the analog trunk circuit (Fields 9 through 13) paired with

the digital trunk circuit of Fields 3 through 7.

_ ______________________________________________________________________________________

Wd 1 2 3-7

8

9-13 PROC

_

______________________________________________________________________________________

_

______________________________________________________________________________________

1 tgroup1

digital

circuit tgroup2 analog

circuit 180

_

______________________________________________________________________________________

Modem Pooling Testing

After assigning modem pooling on System 85 or Generic 2, test the modem-pooling facilities as follows:

1. Use Procedure 100, Word 2 to enable demand testing:

On System 85: Set Field 18 to 1 (if it is displaying a 0).

On Generic 2: Set Field 7 to 1 (if it is displaying a 0).

2. Use Procedure 646 to test the modem pool:

a. Press NEXT

TEST once (Field 1 = 2).

b. In Field 2, enter a ‘0’.

c. In Field 3, enter the digital or analog trunk group number.

d. Press NEXT

CIRCUIT until Fields 7 through 11 display the equipment location just added.

e. Press EXECUTE . (If the test passes, field 12 will equal ‘0’.)

3. Use Procedure 100, Word 2 to disable demand testing (if you changed Field 7 or 18 to 1 prior to

testing):

On System 85: Set Field 18 back to 0 (if it was previously displaying a 0).

On Generic 2: Set Field 7 back to 0 (if it was previously displaying a 0).

4. Use Procedure 620 to test the analog facilities:

Run Test 2 on the analog circuits (SN243B).

5. Use Procedure 622 to test the digital facilities:

Run Test 2 on the digital circuits (SN270B or TN754).