12.4.3 CONNECTION OF HEATED LINE FOR PORTABLE VERSION (ART. NO. 01G6190)
If, for the portable version in a carrying case, the option temperature controller for heated line (Art. No.
01G6190) is selected, on the rear of the housing of the CSS-VC.. there is a 7-pin connector for
connection of heated lines type PSP and PSP 4M and PSP 4M-W. These have at the point of
connection and termination a 7-pin connector and a 7-pin socket for connection to the portable gas
conditioning unit CSS-VC.. and the portable gas sampling probe type PSP4000H. This is the power
supply to the heated line and gas sampling probe using the CSS-VC...
3 Mains
probe
1 Mains L
2 Mains N
4 Mains
probe
6 PT100
5 PT100
Figure 10
Heated line connection for portable version to 10A
12.4.4 CONNECTING THE OPTIONAL EXPANSION MODULES
The connection of expansion modules to the CSS-VC.. is via the communication module with the
appropriate cable to the RJ-45 socket in the connection panel (see Figure 3).
The electrical connection of the individual expansion modules is described in Section 15.
N O T I C E !
The RJ45 socket is only suitable for the connection of the
communication module. A network connection is not possible with it!
13
COMMISSIONING
Before commissioning, the plant and process-specific safety measures must to be observed.
Before switching on the power supply, it should be checked again that the operating voltage (see
nameplate) and the power supply voltage correspond!
W A R N U N G !
Before comissioning exclude that for one channel as well