beautypg.com

6 other notes on operation – Primera Technology Fujitsu Tape Drive RX300 S2 User Manual

Page 153

background image

153

PRIMERGY RX300 S2 User’s Guide

5

Operatio

ns
after O
S

In

st

al

lation

■ BIOS Setup Utility Setting

When power management is performed via a LAN, configure the settings as follows using the BIOS

Setup Utility. The power management via a LAN is set to "Enabled" by default.

1

Start the BIOS Setup Utility.

"8.2.1 Starting and Exiting the BIOS Setup Utility" (pg.223)

2

From the [Advanced] menu, select the [Power On/Off] submenu and press the

[Enter] key.

The [Power On/Off] submenu window appears.

3

Set [Power On Source: LAN] to [Enabled].

"8.2.9 Power On/Off Submenu" (pg.237)

To start up the server via a LAN, refer to "

Performing Remote Installation" ( pg.44).

5.5.6 Other Notes on Operation

■ Unnecessary Files

After OS installation is completed, folders named Runonce and Runonce 2 may be left in the drive

where the OS is installed. Delete these folders since you do not need them for the system operation.

■ Notes on 24-hour Operation

Automated System Operation

To provide an extra margin of safety against unintentional damage, introduce disaster-prevention

measures in the office and keep disaster prevention personnel (such as a security guard or janitor) in the

building.

Unintentional Power-off Prevention

We recommend the installation of a special power supply device (such as a distribution board) to prevent

unplanned power shut-offs.