beautypg.com

3 installing linux – Primera Technology Fujitsu Tape Drive RX300 S2 User Manual

Page 123

background image

123

PRIMERGY RX300 S2 User’s Guide

4

Manu

al O
S

In

st

allation

The installation of Windows 2000 Server has completed.

Before Starting Operation

After OS installation, refer to the following and perform the necessary procedures.

• High reliability tool installation

To ensure stable server operation, refer to "Chapter 6 High Reliability Tools" ( pg.167) and install

high reliability tools.

"Chapter 5 Operations after OS Installation" ( pg.129)

Perform the necessary procedures.

4.2.3 Installing Linux

For the use of Linux, refer to the Fujitsu PRIMERGY website (http://primergy.fujitsu.com).