3 installing linux – Primera Technology Fujitsu Tape Drive RX300 S2 User Manual
Page 123

123
PRIMERGY RX300 S2 User’s Guide
4
Manu
al O
S
In
st
allation
The installation of Windows 2000 Server has completed.
●
Before Starting Operation
After OS installation, refer to the following and perform the necessary procedures.
• High reliability tool installation
To ensure stable server operation, refer to "Chapter 6 High Reliability Tools" ( pg.167) and install
high reliability tools.
• "Chapter 5 Operations after OS Installation" ( pg.129)
Perform the necessary procedures.
4.2.3 Installing Linux
For the use of Linux, refer to the Fujitsu PRIMERGY website