T1 Interface
47
Model 3086 G.SHDSL Integrated Access Device User Guide
4 • Basic Application Configurations
Switch Bank S3
The table below shows the default configuration for switch S3. A description of S3 options follows this table.
Switch S3-1: CO/CP selection. CO and CP stand for Central Office and Customer Premise respectively.
When deploying the model 3086s, units installed at the Customer location should be set to CP and units
installed at a Central Office should be set to CO. For point-to-point operation, one unit must be CO while the
other must be CP.
Switch S3-3: Transmit Clock Mode. Use Switches S3-3 to configure the 3086 for internal or external (net-
work) clock mode.
Table 7. S3 Summary Table
Switch Position
Function
Factory Default
Selected Option
S3-1
CO/CP Selection
On
CO
S3-2
Reserved
On
Reserved
S3-3
Clock
On
Network
S3-4
Reserved
On
Reserved
S3-5
Reserved
On
Reserved
S3-6
Annex
Off = Annex A
On = Annex B
Annex B
S3-7
Reserved
On
Reserved
S3-8
Reserved
On
Reserved
S3-3
Setting
Off
CP
ON
CO
S3-3
Clock mode
Off
Internal. DSL and T1 transmit clock generated by the 3086
On
External. DSL and T1 transmit clock derived from the received T1 signal (CO con-
figuration only)