beautypg.com

Isdn provisioning, Site preparation checklist – Juniper Networks J4350 User Manual

Page 99

background image

Preparing for Router Installation

ISDN Provisioning

You might need a network termination type 1 (NT1) device to connect
your ISDN interface to the ISDN service. Contact your service provider
for details on the following information:

External NT1 device and ISDN cable

If the two items are required, where to obtain the items

List of NT1 vendors

Site Preparation Checklist

The checklist in Table 33 summarizes the tasks you need to perform when
preparing a site for Services Router installation.

Table 33: Site Preparation Checklist

Item or Task

Performed By

Date

Notes

Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.

Measure the distances between external power
sources and the router installation site.

Select the type of rack.

Plan the rack location, including required
space clearances.

Secure the rack to the floor and the building
structure.

Acquire appropriate cables and connectors.

Site Preparation Checklist

79

This manual is related to the following products: