beautypg.com

2 voltage recovery timing specifications – Intel SE7525GP2 User Manual

Page 168

background image

Intel® Server Board SE7320SP2 & Intel Server Board SE7525GP2 TPS

General Specifications

Revision 2.0

168

Figure 22. Turn on / off Timing

8.4.2 Voltage

Recovery

Timing Specifications

The power supply must conform to the following specifications for voltage recovery timing under
load changes:

• Voltage shall remain within +/- 5% of the nominal set voltage on the +5 V, +12 V, 3.3

V, -5 V and -12 V output, during instantaneous changes in load shown in the
following table.

• Voltage regulation limits shall be maintained over the entire AC input range and any

steady state temperature and operating conditions specified.

• Voltages shall be stable as determined by bode plot and transient response. The

combined error of peak overshoot, set point, regulation, and undershoot voltage shall
be less than or equal to +/-5% of the output voltage setting. The transient response
measurements shall be made with a load changing repetition rate of 50 Hz to 5 kHz.
The load slew rate shall not be greater than 0.2 A/

µs.

AC Input

Vout

PWOK

5VSB

PSON

T

sb_on_delay

T

AC_on_delay

T

pwok_on

T

vout_holdup

T

pwok_holdup

T

pson_on_delay

T

sb_on_delay

T

pwok_on

T

pwok_off

T

pwok_off

T

pson_pwok

T

pwok_low

T

sb_vout

AC turn on/off cycle

PSON turn on/off cycle

This manual is related to the following products: