Intel SE7525GP2 User Manual
Page 167
Intel® Server Board SE7320SP2 & Intel Server Board SE7525GP2 TPS
General Specifications
Revision 2.0
167
Table 102. Turn On / Off Timing
Item
Description
Min
Max
Units
Tsb_on_delay
Delay from AC being applied to 5VSB being within regulation.
1500
msec
T ac_on_delay
Delay from AC being applied to all output voltages being within
regulation.
2500
msec
Tvout_holdup
Time all output voltages stay within regulation after loss of AC.
21
msec
Tpwok_holdup
Delay from loss of AC to de-assertion of PWOK
20
msec
Tpson_on_delay Delay from PSON# active to output voltages within regulation limits.
5
400
msec
T pson_pwok
Delay from PSON# deactive to PWOK being de-asserted.
50
msec
Tpwok_on
Delay from output voltages within regulation limits to PWOK asserted at
turn on.
100 1000 msec
T pwok_off
Delay from PWOK de-asserted to output voltages (3.3V, 5V, 12V, -12V)
dropping out of regulation limits.
1 200 msec
Tpwok_low
Duration of PWOK being in the de-asserted state during an off/on cycle
using AC or the PSON signal.
100
msec
Tsb_vout
Delay from 5 V SB being in regulation to O/Ps being in regulation at AC
turn on.
50 1000
msec
T5vsb_holdup
Time the 5 VSB output voltage stays within regulation after AC lost.
70
msec