Power on/off, 3 power on/off, Power on – Sekonic Speedmaster L-858D-U Light Meter User Manual
Page 19
5
2. Before Use
2-3
Power ON/OFF
Power ON
1.
Press the Power Button
5
.
The meter turns on.
The Startup Screen appears on the LCD for
one second.
Then operating assignment for the
Measuring Button
6
(MEASURE) and
Memory Button
7
(MEMORY) are displayed
on the Measuring Screen for two seconds.
Startup Screen
Startup Screen that appears
if a transmitter (sold
separately) is installed
Measuring Screen
Measuring Screen
Power Button
5
Memory Button
7
Measuring Button
6