Operator’s manual – Great Plains DICKEY-john MVT Monitor Operator User Manual
Page 55
OPERATOR’S MANUAL
IntelliAg MVT
11001-1643-201401
46 / CHANNEL SETUP
To Activate Precharge:
1. At the Control screen, enter a Precharge time. A Precharge Time must
be entered as a POSITIVE number (5.0 seconds) before the
Precharge Ground Speed feature displays on the Speed Setup screen
(Refer to Ground Speed section).
2. Press the Top Menu button and select the Speed Set button.
3. Enter a Precharge Ground Speed greater than 0.
IMPORTANT: Turn the master/control switch ON to activate the
Precharge feature.
Delay Time
IMPORTANT: A Delay Time number MUST be entered as a negative
number (-5.0 seconds) for the system to identify
between a Delay Time or Precharge state. At the virtual
keypad, scroll the rotary knob counter clockwise until
negative numbers appear.
NOTE:
Delay Time functionality may
work differently than described
above if the system has been
purchased direct from the
original equipment
manufacturer. Refer to the
manufacturer’s operator
manual for further instruction.
With an Implement Lift Switch
Delay Time determines the length of time before the control channel will
start after the master/control switch has been turned ON and the implement
switch is in a lowered position.
•
The system will immediately shutdown the channel when the
implement lift switch is in the raised position.
•
The system will delay the channel shutdown if the master/control
switch is turned OFF and the implement is in the down position.
Without an Implement Lift Switch
When the Delay Time feature is utilized without an implement lift switch:
•
The control channel will delay after the master/control switch has been
turned ON.
•
A delay will also occur and then shutdown the control channel when
the master/control switch is turned OFF.