Operator’s manual, Connecting cab/terminal harnessing, Connecting implement harnessing – Great Plains DICKEY-john MVT Monitor Operator User Manual
Page 22
OPERATOR’S MANUAL
IntelliAg MVT
11001-1643-201401
COMPONENT INSTALLATION / 13
12. Connect any additional adapter harnesses to the module harness. The
PCM Module harness can accept the following adapter harnesses:
– Actuator Harness: This harness accepts up to 2 output control
channels, 2 control channel feedbacks, 3 hopper level sensor
inputs, 3 air pressure inputs, 2 RPM sensor inputs, a ground speed
input, and an implement switch input. In addition, a pair of 6-pin
connectors are available for Servo connection which use FB1/FB2
respectively. Install sensors, valves, etc. per the instructions
included with the items. Install the PWM valve assembly and
feedback sensor for each control loop and connect the devices to
their respective inputs on the harness, making certain to match
PWM 1/Servo 1 with FB 1, PWM 2/Servo 2 with FB 2, etc. Secure
any unused and excess cable lengths where necessary. Refer to
(
Figure 15
) for additional information.
– Seed Sensor Harness: This harness accommodates any standard
Dj Seed Sensor harness (PM style or SE style) harness depending
on the PCM harness. A wide variety of harnesses are available to
accommodate various numbers of sensor inputs. Install all seed
sensors per the instructions included with the individual sensors.
Secure any unused or excess cable lengths as necessary.
CONNECTING CAB/TERMINAL HARNESSING
Refer to (
Figure 13
).
1. Connect the cab harness to the back of the virtual terminal.
2. Insert the USB component into the terminal bracket USB opening.
3. Secure the USB component to the bracket with the supplied locking
nut.
4. Connect the power leads directly to the battery.
5. Connect the ignition wire to a switched +12VDC.
6. Connect the chassis ground lead to a bare point of the cab frame that
offers a good chassis ground connection.
7. Connect the CAN terminator, radar speed sensor, and row switch
module to the respective connectors on the cab harness.
TIP: If the speed sensor is connected to the IntelliAg actuator/
control harness, do not connect anything to the speed sensor
connector on the cab harness.
CONNECTING IMPLEMENT HARNESSING
Refer to (
Figure 14
) and (
Figure 15
).
1. Connect the Implement CAN Breakaway extension to the mating
connector of the cab harness.
2. Route the harness along the implement hitch to the PCM module
harness (use an implement extension harness if additional length is
needed).
3. Secure harness as needed.
4. Connect the module harness to the mating connectors of the
Implement CAN harness and then connect the module to the harness.
The PCM module uses a 30 and 18-way connector with a jackscrew to