7 bolting cabinets together, Bolting cabinets together – Emerson Liebert NX 10-30kVA User Manual
Page 37
Maintenance Bypass Cabinet
29
4.7
Bolting Cabinets Together
1. Line up cabinets so that mounting holes are aligned.
2. Using supplied hardware, bolt the cabinets together. The bolts may be inserted from either the
UPS side or from the MBS side, whichever is more convenient.
NOTE
UPS wiring must be completed before the cabinets are bolted together.
Place cabinets so mounting holes are
aligned.
A bolt from the adjacent cabinet may be
screwed into the threaded top hole, or a
bolt may be inserted through the lower
hole and screwed into the threaded hole
in the adjacent cabinet.
See also other documents in the category Emerson Tools:
- 1000VA (2 pages)
- SAG581126000 (123 pages)
- Liebert NX 400V (132 pages)
- Nfinity 240V (44 pages)
- 10 kVA (16 pages)
- 12-20kVA (8 pages)
- NT5C06D (56 pages)
- Liebert Remote Monitoring Panel (28 pages)
- AccuVar UL94-5V (2 pages)
- PSA1000MT3-120U (2 pages)
- Liebert Power Solutions (44 pages)
- Series 610 (52 pages)
- Liebert GXT2-10KIPPCBL (2 pages)
- GXT2-PP20KRT208 (36 pages)
- Liebert FS 510 VDC (2 pages)
- Libert AC Power System (4 pages)
- 250-400kVA (72 pages)
- Albr BDS-40 (2 pages)
- NXL 400 kVA (2 pages)
- PSI-XR (4 pages)
- Liebert GXT2-10000RT208 (56 pages)
- LXP48F1 (43 pages)
- LIEBERT GXT5000R-208 (32 pages)
- 650VA (2 pages)
- Liebert NX 208V (80 pages)
- 480VAC (2 pages)
- Liebert NX 480V (108 pages)
- Liebert UPStation GXT2U (40 pages)
- 7400 (67 pages)
- GXT2U (40 pages)
- Series 600 (168 pages)
- Remote Power Monitor Panel (2 pages)
- Albr BDS-256XL (2 pages)
- Packaged Drives and Engineered Systems (24 pages)
- NXL UPS Systems (48 pages)
- LIEBERT NPOWER 30-130KVA (2 pages)