beautypg.com

HEIDENHAIN iTNC 530 (340 49x-03) User Manual

Page 396

background image

396

8 Programming: Cycles

8.4 Cy

cles f

o

r Milling P

o

c

k

ets, St

uds and Slots

8

Set-up clearance

Q200 (incremental value): Distance

between tool tip and workpiece surface.

8

Workpiece surface coordinate

Q203 (absolute

value): Absolute coordinate of the workpiece surface

8

2nd set-up clearance

Q204 (incremental value):

Coordinate in the tool axis at which no collision
between tool and workpiece (clamping devices) can
occur.

8

Plunging strategy

Q366: Type of plunging strategy.

„

0 = vertical plunging. The TNC plunges
perpendicularly, regardless of the plunging angle
ANGLE

defined in the tool table.

„

1 = helical plunging. In the tool table, the plunging
angle ANGLE for the active tool must be defined not
equal to 0. The TNC will otherwise display an error
message. Plunge on a helical path only if there is
enough space.

„

2 = reciprocating plunge. In the tool table, the
plunging angle ANGLE for the active tool must be
defined as not equal to 0. Otherwise the TNC
displays an error message.

8

Feed rate for finishing

Q385: Traversing speed of

the tool during side and floor finishing in mm/min.

Example: NC blocks

8 CYCL DEF 253 SLOT MILLING

Q215=0

;MACHINING OPERATION

Q218=80

;SLOT LENGTH

Q219=12

;SLOT WIDTH

Q368=0.2

;ALLOWANCE FOR SIDE

Q224=+0

;ANGLE OF ROTATION

Q367=0

;SLOT POSITION

Q207=500

;FEED RATE FOR MILLING

Q351=+1

;CLIMB OR UP-CUT

Q201=-20

;DEPTH

Q202=5

;PLUNGING DEPTH

Q369=0.1

;ALLOWANCE FOR FLOOR

Q206=150

;FEED RATE FOR PLNGNG

Q338=5

;INFEED FOR FINISHING

Q200=2

;SET-UP CLEARANCE

Q203=+0

;SURFACE COORDINATE

Q204=50

;2ND SET-UP CLEARANCE

Q366=1

;PLUNGING

Q385=500

;FEED RATE FOR FINISHING

9 CYCL CALL POS X+50 Y+50 Z+0 FMAX M3

X

Z

Q200

Q204

Q203

Q369

Q368